On October 17 at 7:00 PM, a meeting was held to inform residents about the 2025 Minerva Lake Road Project. Village Engineer Mike Flickinger will be here to explain the scope of the project and how residents may be impacted during construction. A Question and Answer session followed.
To listen to the meeting recording, click the image to the left.
The Slide show that was presented is available below:
Please email assistantmp [at] minervapark.gov (assistantmp[at]minervapark[dot]gov) or call 614-882-5743 with questions.